Fit for Green Blog

Console Update – Machine Interface Testing and Data Quality

Posted on November 12, 2014

This week’s update is on the technical side.  It is a necessary step to ensure the quality of the integration between the console and equipment as well as the quality of the data that gets displayed.  In the attached video I will demonstrate some of the statistics and some of the process used to accomplish this.

There is variance in the power measurements coming back from the power generation module.  This is not unlike other power measuring devices.  It needs to be handled by grabbing multiple data samples and performing calculations on those samples before rendering the final value.  For more details please watch the 6 minute video attached to the image on the upper left.

Posted in , , | No Comments

No one comment on “Console Update – Machine Interface Testing and Data Quality

Leave a Reply